Axis 2 · Technique · Mechanics and transport

TimeShort
ContextAlone
RiskExposed
GearTechnical

A railway looks like two iron bars laid on stones. It is really a layered structure, designed to carry trains of thousands of tonnes to the millimetre, through rain, frost and heatwaves.

The layers, from bottom to top

  1. The formation: the levelled, compacted, drained ground. A railway starts with earthworks: embankments, cuttings, ditches.
  2. The sub-ballast: a layer of compacted gravel that spreads the loads and stops the soil working its way up.
  3. The ballast: crushed stone, hard and angular, about 25 to 50 mm, some thirty centimetres deep. Its angles lock together and hold the sleepers; its gaps let water through. Round pebbles wouldn't hold anything.
  4. The sleepers (ties in North America): concrete today, creosote-treated wood on older lines, sometimes steel. About 1,666 sleepers per kilometre, 60 cm apart.
  5. The fastenings: elastic steel clips that press the rail onto the sleeper, with a rubber pad between them. On wood, large screws called coach screws.
  6. The rails: very hard steel. Main lines use rails of 60 kg per metre.

Gauge

The distance between the inner faces of the two rails:

GaugeNameWhere
1,435 mmStandard gaugeWestern Europe, North America, China, high-speed lines
1,520 mmRussian broad gaugeRussia, Ukraine, the Baltic states, Finland (1,524)
1,668 mmIberian gaugeSpain and Portugal (except high speed)
1,000 mmMetre gaugeMountain lines, Africa, Southeast Asia

At borders where the gauge changes, bogies are swapped, loads are transferred, or variable-gauge wheelsets are used. See The bogie.

Continuous welded rail

Modern rails are no longer laid in lengths with joints: they are welded end to end over kilometres, by electric welding in the factory and thermite welding on site (a reaction of aluminium powder and iron oxide that produces liquid steel, poured into a mould between the two rails).

A one-kilometre rail would like to grow by almost 50 cm between winter and summer. It's prevented from doing so: it's laid under tension, at a chosen temperature, and the ballast and fastenings hold it. In a heatwave, if the track is poorly maintained, it can suddenly kink sideways: that's buckling, one of the reasons for summer speed restrictions.

What you find around it

Maintenance

Tamping machines lift the track, pack the ballast under each sleeper with vibrating tines, and bring the track back to level to the millimetre. Measuring trains run over the network to detect geometry faults and cracks in the rails.

What railway workers know

Sources

Esveld C., Modern Railway Track, MRT Productions, 2nd edition
SNCF Réseau, track technical standards (public documentation)
UIC, leaflets on rails, sleepers and continuous welded rail
Lichtberger B., Track Compendium, Eurailpress